Rubber Plant Utilities

Project Details


CSSI were awarded a complete design build scope for Utilities for a rubber plant wherein we designed the steam system, cooling system and compressed air system for the Greenfield project.

The entire utility rooms were build as skid packages in our facility. They were pressure tested wired and inspected at our facility and were rigged in place and assembled as skids on site. The entire utility room construction to hand over was done under a month on site.